From From and to | To | Truck offered | Price | | | | | | | Lowboy, 40t/120m³ | | 27.10 | | | | | | | Lowboy, 40t/120m³ | | 27.10 | | | | | | | Lowboy, 60t/120m³ | | 27.10 | | | | | | | Lowboy, 80t/120m³ | | 27.10 | | | | | | | Lowboy, 20t/120m³ | | 27.10 | | | | Note: Elevator Platform 10, Base Port (TMRP) | | | Lowboy, 80t/120m³ | | 27.10 | | | | | | | Tilt, 20t/92m³, By sea | | 27.10 | | | | | | | Container carrier, 30t/76m³ | | 24.10 | | | | | | | Isotherm, Tilt, 22t/86m³, ADR, By sea, RearRear | | 22.10 | | | | Note: Sea! There is a ticket, several cars. |
|